After evaluating various alternatives, Ocean County has advanced the final design for the grade separation of Whiting-New Egypt Road (County Route 539/CR-539) over Ridge Way to improve safety, reduce travel delays, and improve Joint Base operations.
Project Description
The project is located along the section of Whiting-New Egypt Road (County Route 539) within the Joint Base McGuire-Dix-Lakehurst in the Townships of Plumsted and Jackson in Ocean County, NJ.
Roadway Characteristics:
Classification: Rural Major Collector
Roadway Width: 30-34 feet with 12 ft lanes in each direction
Speed Limit: 55 MPH
To improve conditions along this roadway and operations on the Joint Base, the following alternatives were considered as part of the concept development phase:
- Alternative 1: No-Build
- Alternative 2: Elevating CR-539 over Ridge Way
- Alternative 3: Elevating Ridge Way over CR-539
- Alternative 4: Installation of Signalized Intersection along CR-539
A matrix was used to compare each of the alternatives against various criteria and Alternative 2 was selected as the Preliminary Preferred Alternative (PPA). Preliminary Engineering for the PPA was completed, and advanced further during the Final Design phase; additional information regarding the PPA final design phase can be found on the Project Delivery page.

Schedule

Community Outreach
The project team is committed to keeping the public informed as the study is conducted. Our goal is to keep the public informed and respond to questions and concerns. As the project moves into future phases, we will continue to prioritize the updating of project information and meeting announcements.
Public Information Center (PIC)
Public Information Centers were held periodically throughout the project. To view the previous presentations click the below link.
View Project Delivery Process